Environmental review panel wants feedback on proposed Marathon mine – Tbnewswatch.com

Sign In
Register
For those who want to have say on how a public hearing for a proposed palladium mine near Marathon should take shape, now is the time to make those voices heard.
Generation Mining's open-pit palladium mine project is under the microscope this fall with a joint federal and provincial environmental assessment process underway.
A government-appointed Joint Review Panel for the proposed mine project wants public feedback on the procedures for how a public hearing will be organized and how interested parties can participate.
The Impact Assessment Agency of Canada said hearing participants are invited to provide the panel with general comments on the procedures.
The date for this hearing has yet to be determined but the review panel will provide a minimum of 45-days notice before the start of the hearing.
The panel will even consider input from participants regarding the dates, locations, and the format of the hearing.
According to a Sept. 23 news release, the agency will consider all "reasonable options" to ensure participants can attend this hearing, including utilizing video communications for virtual sessions.
The company is out to raise $665 million to build an open-pit mine on a deposit located 10 kilometres north of Marathon, a community of 3,300 on the north shore of Lake Superior, situated roughly halfway between Sault Ste. Marie and Thunder Bay.
The Marathon project will offer 1,000 construction jobs following the initial groundbreaking. If government permits are granted, an 18-month construction period will follow with commercial mining production tentatively beginning in late 2023 or early 2024.
The agency said all comments received will be considered public and will be posted on the online public registry.
Written comments in either official language should be sent by Oct. 25, 2021 to:
Jason Patchell Co-Panel Manager,
Marathon Palladium Project c/o Impact Assessment Agency of Canada
160 Elgin Street, 22nd Floor, Ottawa ON K1A 0H3
marathonminereview-examenminemarathon@iaac-aeic.gc.ca
To be kept informed of activities relating to the panel review process, provide an email address to: marathonminereview-examenminemarathon@iaac-aeic.gc.ca
To view the draft Public Hearing Procedures or to obtain information on the Marathon Palladium Project environmental assessment, please consult the Canadian Impact Assessment Registry at www.canada.ca/iaac, reference number 54755.
Dougall Media
© 2021 Dougall Media

source

20 thoughts on “Environmental review panel wants feedback on proposed Marathon mine – Tbnewswatch.com”

  1. Pingback: สล็อตวอเลท ไม่มีขั้นต่ำ

  2. Pingback: buy colt guns

  3. I all the time used to read piece of writing in news papers
    but now as I am a user of web so from now I am using net for posts,
    thanks to web.

  4. Pingback: คาสิโนออนไลน์เว็บตรง

  5. Pingback: betflix68

  6. Pingback: ล่องเรือเจ้าพระยา

  7. Pingback: discuss#female escorts

  8. Pingback: DevOps Consulting Companies

  9. Hi! Do you know if they make any plugins to safeguard against hackers?

    I’m kinda paranoid about losing everything I’ve worked hard on. Any tips?

  10. Pingback: Buy Brand New Firearms Online

  11. Pingback: Alyssa SALT - best love song

  12. Pingback: good cvv shop to buy cvv

  13. Pingback: 1unchecked

  14. Pingback: Buy Safari Trophy Bonded Bear Claw 416 Rem Magnum

  15. Pingback: 홀덤사이트

  16. Pingback: ขายเฟสบุ๊คยิงแอด

  17. Pingback: mushroom pills

  18. Pingback: P938 Nitron Micro-compact

  19. Pingback: CZ P-10 F 9MM 21 ROUND MAGAZINE

  20. Pingback: dinheiro empreendedor

Leave a Comment

Your email address will not be published.